/ Solutions · Close to users

AI Inference

AI inference has to run close to the people and systems that use it. Hyperscale operators build 100 MW campuses in a few places. We build power-ready inference capacity from 1 to 50 MW, where you need it.

Illustration of a long aisle between two rows of server racks

Inference is the whole product. We do not sell hyperscale campuses or general colocation.

The workloads we build for are the ones that cannot sit far from where they are used: real-time medicine near hospitals, drone and IoT networks, and retail and logistics systems that have to respond at once.

A 1 to 3 MW hall serves one metro's workload. A 5 to 10 MW build-to-suit or a campus of up to 50 MW serves a larger one. Whether you need one site or many, every one sits on a construction-ready site with commercial power.

/ In short

Built for
AI inference
Increment
1 to 50 MW
Where
Where you need capacity
Talk to a Specialist

Talk to a specialist.

Tell us the market, the megawatts and the date. We reply within one business day.