/ FAQ

Edge data centers, in plain answers.

What an edge data center is, what we build, and how to work with us.

What is an edge data center?

An edge data center is a small data center located close to the people and systems that use it, instead of in a large remote campus. Because it is close, it answers quickly. That makes it suited to workloads that cannot wait, such as AI inference.

What does Edge AI Site Solutions do?

Edge AI Site Solutions builds 1 to 50 MW build-to-suit edge data centers for AI inference. We are a global provider, with 7 GW of power identified across several hundred construction-ready sites. Our office is in Duluth, Georgia.

What sizes of edge data center do you build?

Between 1 and 50 MW per build. We describe three sizes: a 1 to 3 MW inference hall, a 5 to 10 MW build-to-suit, and a campus of 10 to 50 MW. Each is built to the tenant's specification.

How quickly can an edge data center be delivered?

It depends on the site and the specification. We agree the timeline with each tenant, project by project, and we will walk you through it when we talk.

How much does an edge data center cost to lease?

We price each project individually and do not publish rents. Rent is normally quoted per kilowatt of contracted capacity per month, with energy billed separately, and it depends on size, term, density, redundancy and location. Send us your metro, megawatts, density, redundancy, term and date, and we will come back with an indicative figure.

Do your sites have power?

Yes. Our sites are construction-ready and have commercial power, and we have identified 7 GW of power across them. Where a tenant needs more, we can bring additional power to the site through a partnership.

Where are your edge data center sites?

We are location-agnostic: we build where our tenants need capacity. We do not publish site locations. Tell us where you need capacity, and once an NDA is signed we share the sites that fit, with the power, fiber and capacity facts for each.

How many sites do you have?

Several hundred, with 7 GW of power identified across them, and we keep adding more. Our article 'How we screen a site' explains the criteria.

What is Metro High Availability?

Metro High Availability is our product for workloads that cannot afford a single point of failure. We mirror the workload at a second site 20 to 50 miles from the first. The second site is 25 percent off for the first 36 months, then full price. It is high availability, not disaster recovery.

Do you convert existing buildings into edge data centers?

Yes. Our retrofit program converts existing telecom central offices into edge AI data centers, where the building, the power and the fiber are already there. We are in discussions with a top 10 telecom provider on a partnership to retrofit several thousand of their sites. Details are shared under NDA.

I own land or a building near a substation. Would you be interested?

Possibly. A few acres near power and fiber, or a former telecom or industrial building, can be what we are looking for. Tell us where it is, how many acres, and what is on it, and we will tell you plainly whether it fits. We treat what you send us in confidence.

How do investors and operating partners get in touch?

Investors can read our thesis on the Investors page and contact us from there. Operating partners can use the contact form and choose Partner. Detailed materials are shared directly, under NDA.

How do I contact Edge AI Site Solutions?

Call us on (646) 217-6619, email info@edgeaigrid.com, or use the contact form. We reply within one business day.

What we build · How locations are shared ·Insights

Still have a question?

Tell us the market, the megawatts and the date. We reply within one business day.