What we build.

One product: 1 to 50 MW build-to-suit edge data centers for AI inference, where you need them. Four ways to look at it.

01 · 1–50 MW

Build-to-Suit

We build 1 to 50 MW data centers for AI inference to a tenant's specification, where the tenant needs them. Every build sits on a construction-ready site with commercial power.

02 · Power verified

Powered Land and Sites

Our sites are construction-ready and have commercial power. We have identified 7 GW of power across several hundred sites, and where a tenant needs more, we can bring additional power to the site through a partnership.

03 · 20–50 mi mirror

Metro High Availability

For workloads that cannot afford a single point of failure, we mirror the workload at a second site 20 to 50 miles from the first. The second site is 25 percent off for the first 36 months, then full price.

04 · Close to users

AI Inference

AI inference has to run close to the people and systems that use it. Hyperscale operators build 100 MW campuses in a few places. We build power-ready inference capacity from 1 to 50 MW, where you need it.

/ Retrofit

Telecom central offices, converted.

Illustration of an older brick telecom building with a new glass data hall added to one end

Our retrofit program converts existing telecom central offices into edge AI data centers. The building, the power and the fiber are already there, which makes retrofit faster and cheaper than a greenfield build.

We are in discussions with a top 10 telecom provider on a partnership to retrofit several thousand of their sites. Details are shared under NDA.

/ Where we build

Close to users, where the power is.

AI inference needs to run close to its users, where power is available. We are location-agnostic: we build where our tenants need capacity, on sites that are construction-ready and have commercial power.

We do not publish where our sites are. We share site locations, and the power, fiber and capacity facts for each, once an NDA is signed.

How to see our locations

/ Deal structures

How we contract.

  • Build-to-suit

    We build to your specification on a power-ready site.

  • Retrofit

    We convert an existing telecom central office into inference capacity.

/ Pricing

How pricing works.

A build-to-suit data center is priced per project, not from a rate card. We do not publish rents, and neither does anyone else in this market. What we can do is show you how capacity like this is priced, so you know what will move your number before you ask for it.

01

Rent follows the cost to deliver

In a build-to-suit, rent is typically set from what it costs to deliver the facility: the land, the power connection and the construction. It is not read from a market rate card. That is why two sites of the same size can price differently.

02

Capacity is priced by power, not floor space

Data center rent is normally quoted per kilowatt of contracted capacity, per month. The megawatts you reserve matter far more than the square feet you occupy.

03

Energy is usually billed separately

The electricity you use is commonly metered and charged on top of rent. Providers handle it in different ways: passed through at cost, fixed, or passed through with a cap. Ask which, because it decides who carries the risk if power prices change.

/ What moves the price

Size
The rate per kilowatt generally falls as the commitment grows.
Term
A longer term spreads the cost of the build over more years. Build-to-suit terms commonly run ten years or more.
Density and cooling
Higher kilowatts per rack need more cooling. Liquid cooling costs more to build than air.
Redundancy
N, N+1 and 2N are different amounts of equipment, and they price differently.
Location and power
The market, and what power costs at that site, are often the largest factors of all.
Escalation and renewal
How rent changes each year, and on what terms you can extend. Ask whether increases are fixed or tied to an index.

/ Questions to ask any provider

  • What is included in rent, and what is charged on top?
  • How is power billed, and who carries the risk if the utility rate rises?
  • How does rent change each year?
  • What happens if the delivery date slips?
  • Can I expand, and at what price?

Ask us the same questions. We will answer them in writing.

/ Get a figure

What we need to quote.

Send us these six things and we will come back with an indicative figure. If you do not know all of them yet, send what you have.

Request an indicative figure
Metro or region
Where your users are.
Megawatts
On day one, and at full ramp if you plan to grow into the site.
Density and cooling
Kilowatts per rack, and air or liquid.
Redundancy
N, N+1 or 2N.
Term
How many years you expect to commit.
Date
When you need the capacity ready.

Talk to a specialist.

Tell us the market, the megawatts and the date. We reply within one business day.