01 · 1–50 MW
Build-to-Suit
We build 1 to 50 MW data centers for AI inference to a tenant's specification, where the tenant needs them. Every build sits on a construction-ready site with commercial power.
/ Solutions
One product: 1 to 50 MW build-to-suit edge data centers for AI inference, where you need them. Four ways to look at it.
01 · 1–50 MW
We build 1 to 50 MW data centers for AI inference to a tenant's specification, where the tenant needs them. Every build sits on a construction-ready site with commercial power.
02 · Power verified
Our sites are construction-ready and have commercial power. We have identified 7 GW of power across several hundred sites, and where a tenant needs more, we can bring additional power to the site through a partnership.
03 · 20–50 mi mirror
For workloads that cannot afford a single point of failure, we mirror the workload at a second site 20 to 50 miles from the first. The second site is 25 percent off for the first 36 months, then full price.
04 · Close to users
AI inference has to run close to the people and systems that use it. Hyperscale operators build 100 MW campuses in a few places. We build power-ready inference capacity from 1 to 50 MW, where you need it.
/ Retrofit

Our retrofit program converts existing telecom central offices into edge AI data centers. The building, the power and the fiber are already there, which makes retrofit faster and cheaper than a greenfield build.
We are in discussions with a top 10 telecom provider on a partnership to retrofit several thousand of their sites. Details are shared under NDA.
/ Where we build
AI inference needs to run close to its users, where power is available. We are location-agnostic: we build where our tenants need capacity, on sites that are construction-ready and have commercial power.
We do not publish where our sites are. We share site locations, and the power, fiber and capacity facts for each, once an NDA is signed.
/ Deal structures
We build to your specification on a power-ready site.
We convert an existing telecom central office into inference capacity.
/ Pricing
A build-to-suit data center is priced per project, not from a rate card. We do not publish rents, and neither does anyone else in this market. What we can do is show you how capacity like this is priced, so you know what will move your number before you ask for it.
01
In a build-to-suit, rent is typically set from what it costs to deliver the facility: the land, the power connection and the construction. It is not read from a market rate card. That is why two sites of the same size can price differently.
02
Data center rent is normally quoted per kilowatt of contracted capacity, per month. The megawatts you reserve matter far more than the square feet you occupy.
03
The electricity you use is commonly metered and charged on top of rent. Providers handle it in different ways: passed through at cost, fixed, or passed through with a cap. Ask which, because it decides who carries the risk if power prices change.
Ask us the same questions. We will answer them in writing.
/ Get a figure
Send us these six things and we will come back with an indicative figure. If you do not know all of them yet, send what you have.
Request an indicative figureTell us the market, the megawatts and the date. We reply within one business day.